Product and Tool Engineering
...Automotive Pressure Die Castings
|
|
|
|
|
Customer
The primary manufacturer of automotive carburetors for majority of OEMs in the nation.
|
Scope
Product and Tooling Design and Validation
|
Components
Carburetor mixing body
|
Timeframe
75 days from start to completion.
|
|
|
|
|
Engineering Sequence:
|
|
|
|
|
Design: Starting 2D-Drawings
|
|
| |
|
|
Design: Completed 3D-Components
|
|
|
| |
|
|
DFM: 3D-Tooling Design
...optimum side-core count ...optimum insert placements ...optimum location of injection points ...choice of hot and cold runners ...optimized cooling methods ...suitable ejection mechanisms ...tool life-cycle considerations ...cross-functional team reviews |
| |
|
|
DFM: 3D-Mold Assembly (fixed, moving, combined assemblies)
|
|
|
|
| |
|
|
Design Validation: Actual Component
|
|